SoftLayer Scheduled Maintenance [10/09/2006]
Date: Monday October 9th 2006 (10/09/2006)
Start time (CDT): 5:00 am
End time (CDT): 6:00 am
Duration: 10 minutes
Services affected: backend network connectivity, VPN
connectivity
Location: dal01
SoftLayer Engineers will be conducting maintenance on the
backend network on Monday October 9th starting at 5:00 am CDT.
During this maintenance window customers will notice a brief
period of connectivity loss on the backend network while some
configuration changes are made to bcr01.dal01 to improve
performance, reliability, and scalability. Although the downtime
is only expected to be no more than 10 minutes, we have allotted
a maintenance window of 1 hour. Frontend connectivity will not
be affected.
If you have any problems after this time frame with regard to
connectivity, or if you have any questions regarding the
maintenance at any point, please open a ticket in the customer
portal.
We appreciate your patience during this work and welcome any
feedback.
Thank You,
SoftLayer Engineering
214-442-0603
noc@softlayer.com
-
بالفعل وصلتني الرساله وان شاء الله ما بتطول
عموما التوقيت راح يكون بتوقيت مكه من الساعه 2 ظهرا للساعه 3 عصرا
وبتوقيت القاهره من الساعه 1 ظهرا للساعه 2 ظهرا
وان شاء الله تعدي على خير وما تتوقف السيرفرات أكتر من 10 دقائق
-
وصلتني رسالتهم ...
وان شاء الله ماتتعدى اكثر من 10 دقائق ..
ضوابط المشاركة
- لا تستطيع إضافة مواضيع جديدة
- لا تستطيع الرد على المواضيع
- لا تستطيع إرفاق ملفات
- لا تستطيع تعديل مشاركاتك
-
قوانين المنتدى
أضف موقعك هنا |
اضافة محتوى فريد لموقعك